Place of Origin | China |
Brand Name | horizontal-slurrypump.com |
Certification | ISO |
Model Number | OEM |
Document | Product Brochure PDF |
Features
1. Durable slurry pump used for mines and industry solids pumping.
2. Slurry pump drive module design which makes the spare parts can be changed easily
3. Designed and built for long time with low maintenance for the Heavy brand slurry pump
4. Equipped the electric motor or diesel engine with slurry pump according to your requirement
6. Long service life for the wet parts of slurry pump
Packing:
Packed into a wooden or plywood case
Made high quality wood, they cases are exporting standard.
Materials
Impeller | high-chrome alloy or rubber |
Volute liner | high-chrome, A05 |
Shaft | 45# steel thermal refining |
Base/frame plate | ductile casting iron/gray casting iron |
Pump seal | stuffing box and expeller; strut mount and expeller; stuffing box |
Water seal ring and disassembly ring | stainless steel |
Application of slurry pump
Minerals Flotation Processing
Electric Factory Coal Preparation
Coal Washing
Chemical Medium Processing
Effluent Handling
Sand And Gravel Handling
Parts Table
METAL LINED PUMPS | RUBBER LINED PUMPS | ||||
No. | Part Description | Material Specification | No. | Part Description | Material Specification |
1 | Base | Cast Iron | 1 | Base | Cast Iron |
2 | Shaft | 4140 High Tensile Steel* | 2 | Shaft | 4140 High Tensile Steel* |
3 | Bearing Assembly | Timken (Cast Iron Body) | 3 | Bearing Assembly | Timken (Cast Iron Body) |
4 | Shaft Sleeve | 420 Stainless Steel | 4 | Shaft Sleeve | 420 Stainless Steel |
5 | Pump Casing | Cast Iron | 5 | Pump Casing | Cast Iron |
6 | Frame Plate Liner | 27% Chrome White Iron | 6 | Frame Plate Liner Insert | Rubber |
7 | Volute Liner | 27% Chrome White Iron | 7 | Cover Plate Liner | Rubber |
8 | Impeller | 27% Chrome White Iron | 8 | Impeller | Rubber Coated High Tensile Steel |
9 | Throat Bush | 27% Chrome White Iron | 9 | Throat Bush | Rubber |
10 | Joint Rings | Rubber | 10 | Cover Plate | Cast Iron |
11 | Cover Plate | Cast Iron | 11 | Stuffing Box | Cast Iron |
12 | Stuffing Box | Cast Iron | 12 | Expeller | 27% Chrome White Iron |
13 | Expeller | 27% Chrome White Iron | 13 | Expeller Ring | Natural Rubber |
14 | Expeller Ring | Natural Rubber | 14 | Bolts | Zinc Plated Steel |
15 | Bolts | Zinc Plated Steel | 15 | O-rings | Nitrile Rubber |
16 | O-rings | Nitrile Rubber | 16 | Seals | Rubber |
17 | Seals | Rubber | Bolts | Zinc Plated Steel | |
Bolts | Zinc Plated Steel |
Performance table
MODEL | ALLOWABLE MATING MAX.POWER (KW) |
MATERIAL | CLEAN WATER PERFORANCE | IMPELLER | |||||||
LINER | IMPELLER | Q Capacity | H Head | Speed | Max. Eff. | NPSH | VANES NO. | IMPELLER DIA | |||
m3/h | L/s | (m) | n(r/min) | (%) | (m) | (mm) | |||||
1.5/B-AH | 15 | M | M | 12.6-28.8 | 3.5-8 | 6-68 | 1200-3800 | 40 | 2--4 | 5 | 152 |
RU | RU | 10.8-25.2 | 3--7 | 7-52 | 1400-3400 | 30 | 3 | ||||
1/1.5B-AH | 15 | M | M | 16.2-34.2 | 4.5-9.5 | 25-92 | 1400-2200 | 20 | 2-5.5 | 5 | 330 |
2/1.5B-AH | 15 | M | M | 32.4-72 | 9--20 | 6-58 | 1200-3200 | 45 | 3.5-8 | 5 | 184 |
RU | RU | 25.2-54 | 7--15 | 5.5--41 | 1000-2600 | 50 | 2.5-5 | 5 | 178 | ||
3/2C-AH | 30 | M | M | 39.6-86.4 | 11--24 | 12-64 | 1300-2700 | 55 | 4--6 | 5 | 214 |
RU | RU | 36-75.6 | 10--21 | 13-46 | 1300-2300 | 60 | 2--4 | 5 | 213 | ||
3/2D-HH | 60 | M | M | 68.4-136.8 | 19-38 | 25-87 | 850-1400 | 47 | 3-7.5 | 5 | 457 |
4/3C-AH | 30 | M | M | 86.4-198 | 24-55 | 9-52 | 1000-2200 | 71 | 4--6 | 5 | 245 |
RU | RU | 79.2-180 | 22-50 | 5-34.5 | 800-1800 | 59 | 3--5 | ||||
4/3E-HH | 120 | M | M | 126-252 | 35-70 | 12-97 | 600-1400 | 50 | 2--5 | 5 | 508 |
6/D-AH | 60 | M | M | 162-360 | 40-100 | 12-56 | 800-1550 | 65 | 5--8 | 5 | 365 |
RU | RU | 144-324 | 40-90 | 12-45 | 800-1350 | 65 | 3--5 | 5 | 365 | ||
6/4S-HH | 560 | M | M | 324-720 | 90-200 | 30-118 | 600-1000 | 64 | 3-8 | 5 | 711 |
6S-HH | 560 | M | M | 468-1008 | 130-280 | 20-94 | 500-1000 | 65 | 4-12 | 5 | 711 |
8/6E-AH | 300 | M | M | 360-828 | 100-230 | 10-61 | 500-1140 | 72 | 2-9 | 5 | 510 |
RU | RU | 324-720 | 90-200 | 7-49 | 400-1000 | 65 | 5-10 | 5 | 510 | ||
10/8E-M | 120 | M | M | 666-1440 | 185-400 | 14-60 | 600-1100 | 73 | 4-10 | 5 | 549 |
10/8ST-AH | 560 | M | M | 612-1368 | 170-380 | 11-61 | 400-850 | 71 | 4-10 | 5 | 686 |
RU | RU | 540-1118 | 150-330 | 12-50 | 400-750 | 75 | 4-12 | ||||
12/10ST-AH | 560 | M | M | 936-1980 | 260-550 | 7-68 | 300-800 | 82 | 6 | 5 | 762 |
RU | RU | 720-1620 | 200-450 | 7-45 | 300-650 | 80 | 2.5-7.5 | ||||
14/12ST-AH | 560 | M | M | 1260-2772 | 350-770 | 13-63 | 300-600 | 77 | 3-8 | 5 | 965 |
RU | RU | 1152-2520 | 320-700 | 13-44 | 300-500 | 79 | 3-10 | ||||
16/14TU-AH | 1200 | M | M | 1368-3060 | 380-850 | 11-63 | 250-550 | 79 | 4-10 | 5 | 1067 |
20/18TU-AH | 1200 | M | M | 2520-5400 | 700-1500 | 13-57 | 200-400 | 85 | 5-10 | 5 | 1370 |
Inspection Equipment | |
1. Inspection and Detection | |
With various inspection and detection instruments ,like three-coordinate measuring instrument ,metallographic microscope, direct reading spectrometer ,Brinell hardness meter ,Vickers hardness meter, carbon and sulfur analyzer and other detection equipment,we can carry on the chemical composition analysis ,physical properties test ,coordinate measurement for various steel&steel materials | |
Complete pump set inspection | |
We have performance testing platform for each batch pump inspection before delivery | |
Quality control system for each set slurry pump | |
Purchasing raw material ra |
1. Strict rules and procedures to choose the raw material supplier |
2. Each batch raw material will be tested by quality control department | |
C casting of parts
|
1 .Melting:Chemical element analysis for raw material before and after stove . |
2.Moulding :Strict sand moulding qualified before iron liquid pouring for casting | |
3. Cleaning semi-finished parts sand :Strict inspection on the appearance and size qualified before storage. | |
|
1. Self -inspection and inspection between different steps. |
2. First part inspection | |
3. Procedures inspection | |
4..Inspection before storage the mining AH slurry pumps | |
A Assembling of sl slurry pump |
1. Inspector tracks the whole process of assembly of slurry pumps |
2. Slurry Pump pressure inspection and fillout the testing table | |
3. Painting inspection | |
4. Performance testing and fillout the testing table | |
5. Packing inspection of slurry pump | |
6. Issue quality certificate |
CONTACT US AT ANY TIME