Send Message
Beijing Silk Road Enterprise Management Services Co.,LTD
Email : jeffreyth@slurrypump.com TEL: 86-731-86187065
Home > Products > Heavy Duty Slurry Pump >
Small Chemical Transfer Feed Water Pump For Corrosion High Concentration Slurry
  • Small Chemical Transfer Feed Water Pump For Corrosion High Concentration Slurry

Small Chemical Transfer Feed Water Pump For Corrosion High Concentration Slurry

Place of Origin China
Brand Name horizontal-slurrypump.com
Certification ISO
Model Number OEM
Document Product Brochure PDF
Product Details
Product Name:
Gold Ash Mining Sludge Sump Slurry Pump
More Application:
Solid Pump,tailing Pumps
Liquid Temp:
Max80℃
Location:
China
OEM:
OK
ODM:
Available
Highlight: 

rubber lined pumps

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
based on quantity
Packaging Details
wooden case
Delivery Time
15days
Supply Ability
200sets monthly
Product Description

Small Chemical Transfer Feed Water Pump For Corrosion And High Concentration Slurry

Introduction
The M. AH. HH type slurry pumps are those of cantilever, horizontal and centrifugal slurry pumps, whose shafts can be sealed by packing seals or by centrifugal type seals. The positions of the pump outlet can be positioned at an interval of 45°according to different requirements, so eight different angles can be applied by rotation in installation.
 
Application of slurry pump
· High density slurry transfer;
· Thickener underflow recirculation;
· Reagent dosing;
· Froth flotation;
· Cyanide processing etc.
· Mill discharge;
· Cyclone feed;
· Tailings
 
Model selection :
AH type slurry pump
1  high density and strong abrasiveness, the coefficient of flow range will be 40-80%;
2 medium density and medium abrasiveness, the coefficient of flow range will be 40-100%;
3 low density and low abrasiveness, the coefficient of flow range will be 40-120%.
 HH type pumps
1 medium density and strong abrasiveness, the coefficient of flow range will be 40-80%;
2 low density and strong abrasiveness, the coefficient of flow range will be 40-100%;
3 For the highest efficiency point under a certain RPM condition, its corresponding flow rate will be 100%.

METAL LINED PUMPS RUBBER LINED PUMPS
No. Part Description Material Specification No. Part Description Material Specification
1 Base Cast Iron 1 Base Cast Iron
2 Shaft 4140 High Tensile Steel* 2 Shaft 4140 High Tensile Steel*
3 Bearing Assembly Timken (Cast Iron Body) 3 Bearing Assembly Timken (Cast Iron Body)
4 Shaft Sleeve 420 Stainless Steel 4 Shaft Sleeve 420 Stainless Steel
5 Pump Casing Cast Iron 5 Pump Casing Cast Iron
6 Frame Plate Liner 27% Chrome White Iron 6 Frame Plate Liner Insert Rubber
7 Volute Liner 27% Chrome White Iron 7 Cover Plate Liner Rubber
8 Impeller 27% Chrome White Iron 8 Impeller Rubber Coated High Tensile Steel
9 Throat Bush 27% Chrome White Iron 9 Throat Bush Rubber
10 Joint Rings Rubber 10 Cover Plate Cast Iron
11 Cover Plate Cast Iron 11 Stuffing Box Cast Iron
12 Stuffing Box Cast Iron 12 Expeller 27% Chrome White Iron
13 Expeller 27% Chrome White Iron 13 Expeller Ring Natural Rubber
14 Expeller Ring Natural Rubber 14 Bolts Zinc Plated Steel
15 Bolts Zinc Plated Steel 15 O-rings Nitrile Rubber
16 O-rings Nitrile Rubber 16 Seals Rubber
17 Seals Rubber   Bolts Zinc Plated Steel
  Bolts Zinc Plated Steel      

  
Quality control
      

Inspection Equipment
1. Inspection and Detection
With various inspection and detection instruments ,like three-coordinate measuring instrument ,metallographic microscope, direct reading spectrometer ,Brinell hardness meter ,Vickers hardness meter, carbon and sulfur analyzer and other detection equipment,we can carry on the chemical composition analysis ,physical properties test ,coordinate measurement for various steel&steel materials
Complete pump set inspection
We have performance testing platform for each batch pump inspection before delivery
Quality control system for each set slurry pump

 

        Purchasing raw material

ra      

1. Strict rules and procedures to choose the raw material supplier
2. Each batch raw material will be tested by quality control department

C          casting of parts

 

 

1 .Melting:Chemical element analysis for raw material before and after stove .
2.Moulding :Strict sand moulding qualified before iron liquid pouring for casting
3. Cleaning semi-finished parts sand :Strict inspection on the appearance and size qualified before storage.

 
 
      Machining of
        slurry pump

1. Self -inspection and inspection between different steps.
2. First part inspection
3. Procedures inspection
4..Inspection before storage the mining AH slurry pumps

              Assembling of

sl           slurry  pump

1. Inspector tracks the whole process of assembly of slurry pumps
2. Slurry Pump pressure inspection and fillout the testing table
3. Painting inspection
4. Performance testing and fillout the testing table
5. Packing inspection of slurry pump
6. Issue quality certificate


 

CONTACT US AT ANY TIME

0086-17773109286
Floor 5, 2nd Building, Zhonglu Industrial Zone,Shenzhen City, Guangdong Province China (Mainland)
Send your inquiry directly to us